Elgar CW 1251P-V Specifikace Strana 39

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 62
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 38
Elgar CW-P Series Installation
Operation Manual 2-17
6. Power up all CW units simultaneously, and ensure that each unit is reporting its
address properly on the front panel.
7. Power down all CW units.
8. Connect load wiring as documented below.
9. Connect M/S OUT and M/S IN cables (Elgar PN 890-499-00) between each CW
in a daisy chain pattern.
10. Connect master/slave, analog slave cables (Elgar PN 890-497-40) from master to
slave, one on each master/slave pair.
11. Power up all CW units simultaneously, or the master unit last.
12. Perform all control operations on the A phase CW master unit.
This manual provides methods used to parallel a configuration of two units per phase.
2.9.1 Setup for SinglePhase, Two Units
Figure 3–11 Wiring Diagram for One Phase, Master/Slave Configuration
Zobrazit stránku 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 61 62

Komentáře k této Příručce

Žádné komentáře